Owner: City of Hempstead
Engineer: Bleyl Engineering
NTP: 02/08/2023
Expected Completion: 08/07/2023
Contract Amount: $799,777.00
Description: Construction of a 2,100 GPM Duplex Lift Station Including: excavation & installation of precast wet well structure, connect underground sanitary influent, install discharge piping & valves, connect to existing force main, protective coatings, installation of electrical and controls (ATS, Control Panel, Electrical Gear, Site Lighting, emergency back up generator), and all site work fencing, paving, & gravel road for a fully functioning lift station.